Beamline-specific information for
BL 7.3.1 and 11.0.l
Before applying for beamtime please contact the beamline scientist to
discuss whether the beamline and endstation are suitable for the planned
experiment. It may also be possible to run a brief exploratory experiment
on a test sample. While beamtime at the ALS is granted in multiples of
8-hour shifts, beamtime at beamlines 7.3.1 (PEEM-2) and 11.0.1 (PEEM-3
& Dynamics) is scheduled in multiples of 24-hour shifts. In your beamtime
request, multiply the number of days the project will need by three and
request shifts in 8-hour increments.
Shifts are scheduled in 24-hour blocks, starting in the morning at 8
am. Usually shifts are interleaved day-by-day with those of another user
but they can also be scheduled in a long continuous block. Some experiments,
in particular those that require sample preparation, may not allow interruption.
Please let the beamline scientist know about your preferences.
|